How to do a better weld

How to do a better weld

Feb 18,2022
 the complete operation method and precautions of using a butt fusion machine to connect PE pipes
A professional operation procedure and strong awareness of safety protection can enhance the welding project completed in a more efficient, safe and quality way. Here below minor tips of butt fusion welding and safety for your information.

 

Minor tips on welding

 

    *   Set up the equipment. If necessary, erect a welding tent to protect against rainfall, wind and dust, conduct a trial before actual works to ensure the equipment in good working order

  *   Hold the pipes by clamps, one pipe fixed and one pipe is free to move such that they can be pressed against each other in single direction, then trimming/milling the joint faces

  *   Stop milling/trimming when joint surfaces are plain, even and crack free

  * Check for pipe alignment radially; by bringing the joint faces together. (Max Gap = 0.5mm).

  *   Check for pipe alignment axially in line with wall thickness. 

  *   Clean heating plate with lint free cloth and water/clear spirits.

  *   Check the welding temperature. (Recommended by manufacturer)

  *   Heat up and insert the plate between joint surfaces.

  *  Exert the heating pressure by the hydraulic unit until a bead is formed along the circumference of the joint faces.

  *   Reduce pressure to allow for heat dissipation into wall of pipe axially. (Soaking period).

  *   Remove heating plate over the allocated time and cover it properly to avoid contact with human or any substance,

  *   Press joint faces together, ensuring that the change-over time is not exceeded.

  *   Steadily increase the welding pressure to its allocated value.

  *   Keep at this pressure for the allocated time.

  *   Allow for cooling down at the welding pressure over the allocated time.

  *   (Never remove a weld from the machine before the cooling time has elapsed).

  *   When this cooling time has elapsed, reduce pressure to 0 and remove welded joint from clamps.

  *   Record the joint vs the pipe number, keep record for the jointing.

  *   If malpractice happened at any stage of the process, since the pre-heated PE material is not supposed to re-heat, therefore the touch surface of the PE material shall be cut-off (length of cut-off shall be subject to manufacturer recommendation), re-mill and repeat the jointing process.

 

Safety:

 

l   Do not approach the welding machine when welding in progress, do not touch the materials except trained workers

l   The heating plate is hot, do not touch or avoid contact with any material when idle

l   Maintain good ventilation

l   Aware of electric shock

l   Create a good communication including gesture for working

l   ventilate the workplace

l   Fire extinguisher must be in place when welding in progress, an urgent stop button for power supply shall be established

l   Safety induction to workers before works, and assign a person-in-charge to cover all the safety issue

 

Ivan Wong Sai Wing from Meinhardt

新闻关键词
component removed
RIYANG FUSION MANUFACTURING LIMITED

Riyang fusion machine has been applied to more than 60 countries and regions in the fields of polyethylene pipe manufacturers, gas construction projects, irrigation projects, mining and civil installations, etc.MORE

SPEAK TO AN EXPERT NOW
Do you need the help of a fusion machine? Contact us now?
*Email
*Name
*Tel
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.