The manually operated butt fusion machine is featured by easy use, lightweight and quick operation.
Home / Index
Index
- What is the warranty period of Riyang hdpe fusion machine?
- If the machine is down, how could we repair it or get the replacement part?
- If the fusion joint not pass the visual inspection, what should be done?
- What else accessories needed to work with the fusion machine?
- How often should we replace the blade?
- How could we measure the "drag pressure"?
- What is the "drag pressure"?
- If the pipes are not properly aligned, what should we do?
- What is the power needed for Riyang pipe fusion equipment?
- After welding, could we lay down the jointed pipes on the ground for cooling process?
- How could we calculate the cooling time?
- How could we calculate the soaking time?
- What should we do after facing the pipe ends?
- How much material should be faced from the pipe end before melting?
- Why the heater surface temperature is different from that shown on the digital temperature control?
- How much temperature on the heater surface needed to butt fuse the pipes?
- How long should it take to make a fusion joint?
- What equipment could be found from Riyang Factory and Riyang Store?
- How could we select the right equipment for our project?
Riyang fusion machine has been applied to more than 60 countries and regions in the fields of polyethylene pipe manufacturers, gas construction projects, irrigation projects, mining and civil installations, etc.MORE
SPEAK TO AN EXPERT NOW
Do you need the help of a fusion machine? Contact us now?
- *Name
- *Tel
- *Title
- *Content