The manually operated butt fusion machine is featured by easy use, lightweight and quick operation.
Production and Customization
- If the machine is down, how could we repair it or get the replacement part?May 27,2021
- If the fusion joint not pass the visual inspection, what should be done?May 27,2021
- What else accessories needed to work with the fusion machine?May 27,2021
- How often should we replace the blade?May 27,2021
- How could we measure the "drag pressure"?May 27,2021
- What is the "drag pressure"?May 27,2021
- If the pipes are not properly aligned, what should we do?May 27,2021
- What is the power needed for Riyang pipe fusion equipment?May 27,2021
- After welding, could we lay down the jointed pipes on the ground for cooling process?May 27,2021
- How could we calculate the cooling time?May 27,2021
- How could we calculate the soaking time?May 27,2021
- What should we do after facing the pipe ends?May 27,2021
- How much material should be faced from the pipe end before melting?May 27,2021
- Why the heater surface temperature is different from that shown on the digital temperature control?May 27,2021
- How much temperature on the heater surface needed to butt fuse the pipes?May 27,2021
- How long should it take to make a fusion joint?May 27,2021
- What equipment could be found from Riyang Factory and Riyang Store?May 27,2021
Riyang fusion machine has been applied to more than 60 countries and regions in the fields of polyethylene pipe manufacturers, gas construction projects, irrigation projects, mining and civil installations, etc.MORE
SPEAK TO AN EXPERT NOW
Do you need the help of a fusion machine? Contact us now?
- *Name
- *Tel
- *Title
- *Content